Milestone 3 - Agile Test Plan

Outline your testing strategy, scope, objectives, timelines, and resource allocation.

An Agile test plan is a living document

  • evolves throughout the project, adapting to changes and incorporating feedback from the team.
  • outlines the approach, objectives, and strategies for testing in an Agile software development project.
  • focus is on collaboration, flexibility, and delivering high-quality software in an iterative and incremental manner.

Test Strategy

Define

  • the testing levels (unit, integration, system, etc.),
  • the types of testing (functional, performance, security, etc.), and
  • any specific methodologies or techniques to be used.

Test Scope

  • outline the features, modules, or user stories to be tested.
  • specify relevant requirements or functionalities that need to be covered by the testing effort.

Test Schedule

  • high-level timeline for the testing activities.
    • Since Agile projects work in iterations or sprints, the test plan should align with the iterations and highlight the testing activities to be conducted within each iteration.

Test Environment

  • necessary hardware, software, and network setup required for testing.
  • details about test data, test tools, and any test environment configurations needed.

Test Deliverables

  • Enumerate the key artifacts or deliverables to be produced during the testing process, such as
    • test cases,
    • test scripts,
    • test data sets,
    • defect reports, and
    • test summary reports.

Test Metrics

  • Specify the metrics/measurements to be used to assess the test progress and quality.

This may include metrics like

  • test coverage,
  • defect density,
  • test execution progress, and
  • pass/fail rates.